Installing A Bathtub
Mounting a tub isn't exactly brain surgery, however it does require strong plumbing, carpentry, and occasionally, tiling skills. Replacing an old bath tub with a new one is additionally a moderately difficult task. If the old tub is readily obtainable, the job can move rapidly; if you have to open a wall surface to eliminate the old bathtub and place the new tub, the task is much harder. In either instance, the task is within a house handyman's abilities, although you will certainly need an assistant to move out the old bathtub and embeded in the new one. See to it you have certified yourself for the task as well as fit attempting it. Instead of working with a service provider to take control of a halfway-completed project, it is much better to think about using one before you begin. Possibilities are you might require a professional plumber to make tube connections.
This short article will certainly aid you install a new tub in your shower room if you have actually currently acquired a new bathtub and also don't need to alter the setup of your previous water supply pipes.
Your devices and also material checklist must consist of the following:
  • New Bath tub
  • Hammer

  • Pipe Wrenches

  • Prybar

  • Safety Glasses

  • Degree

  • Pliers

  • Flexible Wrench

  • Putty Blade

  • Screwdriver

  • Cold Chisel

  • Tape Measure

  • Pipeline Caps


  • Getting ready for the Setup


    To start with, the sustaining structure supplied with the bath ought to be fitted (if needed) according to the supplier's instructions. Next, fit the taps or mixer to the tub. When suitable the faucet block, it is necessary to see to it that if the faucet comes with a plastic washer, it is fitted between the bath as well as the taps. On a plastic bath, it is also sensible to fit a supporting plate under the taps system to avoid stress on the bath tub.
    Fit the adaptable faucet adapters to the bottom of both faucets making use of 2 nuts and olives (sometimes supplied with the tub). Fit the plug-hole outlet by smearing mastic filler round the sink outlet hole, and then pass the outlet through the hole in the bath. Use the nut supplied by the manufacturer to fit the plug-hole. Examine the plug-hole electrical outlet for an inlet on the side for the overflow pipeline.
    Next off, fit completion of the adaptable overflow pipeline to the overflow electrical outlet. Afterwards, screw the pipeline to the overflow face which ought to be fitted inside the bath. Ensure you use all of the provided washing machines.
    Attach the catch to the bottom of the waste electrical outlet on the tub by winding the thread of the waste outlet with silicone mastic or PTFE tape, as well as screw on the trap to the outlet. Connect the bottom of the overflow tube in a comparable manner.The bathroom must currently be ready to be fitted in its final position.

    Removing Old Touches


    If you require to change old taps with new ones as a part of your installation, after that the first thing you must do is detach the supply of water. After doing so, turn on the taps to drain pipes any type of water staying in the system. The process of removing the existing faucets can be rather troublesome due to the limited accessibility that is commonly the situation.
    Use a container wrench (crowsfoot spanner) or a faucet tool to undo the nut that attaches the supply pipes to the taps. Have a towel prepared for the remaining water that will certainly originate from the pipes. Once the supply pipelines have actually been eliminated, utilize the same tool to loosen up the nut that holds the faucets onto the bath/basin. You will need to quit the solitary faucets from turning during this procedure. When the taps have been gotten rid of, the holes in the bath/basin will certainly have to be cleaned of any kind of old securing compound.
    Before going on to fit the brand-new taps, compare the pipeline links on the old taps to the brand-new faucets. If the old taps are longer than the new faucets, then a shank adapter is required for the new faucets to fit.

    Setting up the Bathtub


    Utilizing the two wood boards under its feet, place the bath tub in the needed placement. The wooden boards are helpful in uniformly spreading out the weight of the tub over the area of the boards rather than focusing all the weight onto 4 small factors.
    The next objective is to ensure that the tub is leveled all round. This can be achieved by inspecting the spirit level as well as adjusting the feet on the tub till the spirit level reviews level.
    To mount taps, fit all-time low of the outermost versatile faucet connector to the ideal supply pipe by making a compression sign up with; after that do the same for the various other tap.
    Activate the supply of water and also inspect all joints and also new pipework for leakages as well as tighten them if essential. Fill up the bath tub and additionally inspect the overflow electrical outlet and the regular outlet for leakages.
    Finally, take care of the bathroom paneling as defined in the producer's user's manual. Tiling as well as securing around the bathtub must wait until the tub has actually been utilized at the very least once as this will certainly resolve it into its last position.

    Fitting New Taps


    If the tails of the brand-new taps are plastic, then you will require a plastic adapter to prevent damage to the string. One end of the adapter fits on the plastic tail of the faucet and the other end supplies a link to the existent supply pipes.
    If you need to fit a monobloc, after that you will certainly call for reducing couplers, which links the 10mm pipeline of the monobloc to the typical 15mm supply pipeline.
    Next, position the tap in the installing opening in the bath/basin making certain that the washers are in location between the faucet and also the sink. Safeguard the faucet in place with the manufacturer offered backnut. When the faucet is safely in place, the supply pipes can be attached to the tails of the faucets. The taps can either be connected by using corrugated copper piping or with typical faucet connectors. The former type must be connected to the tap finishes initially, tightening up only by hand. The supply pipes can later be linked to the various other end. Tighten up both ends with a spanner after both ends have been connected.

    Tiling Around the Bathtub


    In the area where the bathroom fulfills the floor tile, it is necessary to seal the joins with a silicone rubber caulking. This is necessary as the fitting can relocate sufficient to split an inflexible seal, creating the water to penetrate the wall between the bath and the tiling, resulting in issues with moisture as well as feasible leakages to the ceiling listed below.
    You can pick from a selection of coloured sealers to assimilate your components as well as installations. They are offered in tubes as well as cartridges, as well as are capable of sealing voids approximately a size of 3mm (1/8 inch). If you have a bigger space to fill, you can fill it with spins of drenched newspaper or soft rope. Keep in mind to always load the bath tub with water prior to sealing, to allow for the movement experienced when the bathtub remains in use. The sealant can crack rather very early if you do not take into consideration this movement prior to securing.
    Alternatively, ceramic coving or quadrant tiles can be made use of to border the bath or shower tray. Plastic strips of coving, which are easy to use and reduce to dimension, are likewise easily readily available on the marketplace. It is recommended to fit the tiles making use of waterproof or waterproof glue as well as grout.

    A Step-by-Step Guide to Installing a Bathtub


    Is your bathtub looking a bit dated lately? Believe it or not, installing a new one is a project you can do yourself. Whether your bathtub is broken or doesn’t fit in with your current bathroom’s design, you can fix it without having to hire a contractor or paying labour costs.



    But, beyond saving money, there are other benefits of installing your own bathtub. When you do this project yourself, you can customise every step of the process. You can also make sure the finished product looks exactly the way you want it to.



    This DIY project is quite involved, but by doing some research, preparing your bathroom and using the right equipment, it is definitely one you can take on. This guide will help you understand the technical procedures behind installing a new bathtub.


    Remove the Existing Bathtub


    To remove the old bathtub, you will need to turn the water supply off before you start any work. After you turn the water off, there will likely still be some water left in your plumbing system, which you can remove by turning on a faucet below the level of the bathtub. Once the water stops running, you are ready to start working.



    The easiest way to remove the tub is to remove the faucet, handles and other piping and then pull the tub out from the wall. If this doesn’t work in your situation, you will need to remove part of the wall, remove the piping and then slide the tub out.


    Choose the Right Bathtub


    The ideal way to replace your bathtub is to find one that has the exact dimensions and has the drain and faucet on the same side as your old one. This way, it will fit in the same place and you won’t have to change the piping system in your bathroom. Choose a tub that matches your home’s decor and fits with the style of the bathroom.


    Install the Plumbing and Ledger Board


    You can purchase a tub drain kit at a hardware store which will have all the pieces you will need for your new tub’s plumbing. Follow the instructions that came with the kit to install the plumbing in the new tub and then take measurements to make sure the plumbing in the tub will align with the plumbing in your bathroom. If it doesn’t, now is the time to make necessary adjustments.



    Some bathtubs need a ledger board that is installed on the wall behind the tub to help support it. If your new bathtub requires one, the directions that came with it will tell you how high it should be installed. If your old bathtub had a ledger board, and it is still in good condition, you can adjust its height to match the new bathtub.


    Install the Bathtub


    When the plumbing and ledger board are ready, you can install the new bathtub. Carefully lower it into the space, being careful not to damage the tub, wall, plumbing or ledger board. Since bathtubs are very heavy and you will need to line the tub up exactly, it is wise to have someone help you with this step.



    Once the tub is in place, it needs to be perfectly level, so use a bubble level instead of estimating how level the tub is. Put the level on the top edge of the tub, not the bottom on the inside, since many tubs are designed with a sloped bottom.



    If the bathtub isn’t level, adjust the ledger board and shift the tub until it is. When it is level, use screws to attach the tub to the wall studs. Most bathtubs have pre-drilled holes in the upper flange, so use these but do not over tighten the screws.


    Hook up the Plumbing


    Now that the bathtub is installed, it needs to be attached to your plumbing system. First, install the shoe fitting under the tub and drain pipe, then the overflow pipe and then the drain flange. Your tub plumbing kit will include specific instructions on how to install these pieces.


    Install the Bathtub Surround


    A bathtub surround will protect the walls around the tub from water damage and can give your new bathtub a more finished look. To install one, make sure the wall is completely clean and dry so that the adhesive will be able to hold the surround securely. Then, measure the surround and mark the same dimensions on the wall above the tub.



    Following the directions that came with the surround adhesive, apply it to the wall. Press the surround against the wall on top of the adhesive and then pull it away for about three minutes to activate the adhesive, then apply the surround again. Keep in mind that this is the most common way to use an adhesive, but you should check the instructions on the package for any special steps.



    If there is any excessive adhesive around the sides of the surround, you can use mineral spirits to remove it. Then use masking tape to hold the surround panels in place until the adhesive is dry. Using silicone, seal all the cracks between the surround panels and the gap between the bottom of the panels and the top of the bathtub.



    If you want to install tile above your bathtub, instead of a bathtub surround, the process will be very similar. But, you will need to measure and cut tiles and install each one individually, using tile spacers to make sure they are evenly spaced. You will then use grout to fill in the spaces between the tiles.

    https://www.hss.com/blog/bathroom/a-step-by-step-guide-to-installing-a-bathtub/


    Installing A Bathtub

    Hopefully you liked our topic on How to Install a Bathtub: Install an Acrylic Tub and Tub Surround. Thanks so much for taking the time to read our short article. Are you aware of another individual who is involved in A Step-by-Step Guide to Installing a Bathtub? Be sure promote it. I cherish reading our article about How to Install a Bathtub Yourself.




    Visit My Site


    Report this page